A Happy New Year from FESS Group; We’re Back Open Today
What’s new at FESS Group for 2026?
We’ve expanded into a new Doncaster workshop, boosting how we organise, prepare, and deliver work across multiple contracts. We’re back open today, Monday 5 January 2026, ready to mobilise your January projects.
Happy New Year from everyone at FESS Group! Thank you to our customers, suppliers, partners and brilliant team for a strong 2025. One headline milestone we’re proud of: relocating to our new Doncaster workshop. It’s not flashy, but it’s a practical upgrade that improves staging, pre-assembly, stock control and turnarounds when timelines are tight, and several contracts run concurrently. The result? More consistent delivery, better reliability and faster site readiness for you.
How the new Doncaster workshop helps you
- Quicker mobilisation: better layout = faster prep, kitting and QA, so crews arrive on site ready to go.
- Smoother multi-contract delivery: Dedicated zones keep parallel projects moving without cross-overs.
- Improved quality control: Enhanced inspection and test areas mean fewer snags and cleaner handovers.
- Scalable capacity: More space and better flow to meet demand spikes without compromising standards.
Our focus for 2026
Build capacity. Streamline processes. Maintain consistent delivery as demand grows. From feasibility to final sign-off, we provide end-to-end industrial project management and consultancy that keeps works safe, compliant and on budget.
Where we add the most value
- Industrial project management & consultancy
- Mechanical and electrical services (design, install, testing & commissioning)
- Machinery maintenance to minimise downtime
- Lift & shift: single items through to full factory moves and decommissioning
- Process & control automation, end-of-line and inspection systems (including metal detection)
- Control panel design & manufacture
Backed by affiliations such as SafeContractor, ECA and IOSH, we keep safety front and centre while protecting production and compliance.
Planning January works? Let’s map it out now.
If you’ve got January activity to schedule, we’ll lock in scope, dates, access and priorities, align RAMS, and mobilise the right engineers and partners. Whether it’s machinery maintenance, a critical lift & shift, or M&E installation, we’ll help you start fast and finish strong.
Wishing you a happy, healthy and prosperous New Year. Here’s to safe projects, smooth production and confident growth in 2026.
FAQs
What changed with the new Doncaster workshop?
More space, smarter layout and upgraded QA areas. That means faster mobilisation, better consistency across simultaneous contracts and tighter quality control.
How quickly can you start in January?
Share your scope and preferred dates, and we’ll confirm access requirements, RAMS and sequencing, then allocate engineers to mobilise promptly.
Which projects benefit most from early-year planning?
Any works dependent on access windows, production changeovers or third-party interfaces: M&E installs, conveyor upgrades, inspection systems, panel builds and lift & shift.
Do you operate in high-compliance environments?
Yes. We routinely deliver in food & drink, pharma and petrochemical settings, working to rigorous safety and hygiene standards.
Can you advise on lifting compliance?
Absolutely, we plan and execute to current regulations and can point you to helpful guidance such as the HSE’s LOLER information (useful for lift planning and inspections).